Operations & Maintenance Plans
Asbestos assessment and independent project support
Read our customer reviewsWhen asbestos-containing materials remain in a building, EIS can help establish a practical operations and maintenance plan. The plan supports day-to-day decisions about where materials are located, how maintenance work is reviewed, and when changing conditions call for professional attention. It gives owners and maintenance teams a shared reference for managing materials over time and planning future work around them.
Discuss your projectA scope built around your project
Owners and facilities teams managing identified materials that remain in place.
Independent assessment and guidance
EIS provides the agreed inspection and consulting services. A separate contractor performs asbestos abatement.
Findings you can use
Understand the assessed areas, documented limitations, and next planning decision.
When is an operations and maintenance plan useful?
When asbestos-containing materials remain in a building, an owner needs a practical way to keep their locations and management decisions connected to everyday work. An operations and maintenance plan can support that process where management in place is appropriate.
The decision considers the material, observed condition, accessibility, and potential for disturbance. A positive laboratory result alone does not decide the entire response. Damage, planned construction, or changing building use may call for reassessment or a different action.
Understand the available responses
- Removal takes the identified material out of the defined work area.
- Repair addresses localized damage where that response is suitable.
- Encapsulation uses an appropriate treatment to bind or seal fibers.
- Enclosure places a protective barrier around the material.
- Management in place leaves suitable materials in the building with documented controls, communication, and condition review.
Choose the response with an asbestos professional after reviewing condition and planned work. These options are not permission for occupants or maintenance staff to disturb suspect material. EIS provides assessment and consulting; a separate contractor performs physical abatement. Project Design & Consulting.
What should the plan organize?
The agreed plan can identify known or assumed materials, responsibility for maintaining records, review of proposed maintenance work, communication with affected parties, and circumstances that trigger professional reassessment. Its value is in helping the owner recognize the asbestos question before work disturbs a documented material.
For example, a routine maintenance request may involve drilling through a surface or entering a space containing a known material. The plan should direct that request through the defined review process. It should be available to the people who coordinate maintenance and contractor access.
Accessing a leaking pipe or replacing a damaged floor component can also bring maintenance into contact with documented or suspect materials. Treat those requests as triggers to review location, condition, and the intended disturbance before work begins. A small repair is not automatically exempt from applicable asbestos requirements.
How is the plan kept useful over time?
Update relevant records when surveys, repairs, abatement, or construction change what is known about the building. Record unresolved limitations and make sure new personnel can find the information. The plan should identify review triggers and the responsibilities agreed with the owner.
A written plan is not automatically a recurring inspection contract. Confirm separately whether condition reviews or other ongoing services are part of the engagement. School-specific AHERA management requirements also need their own project review; this general service page does not promise a complete school program.
Asbestos frequently asked questions
Explore related asbestos services
Discuss managing asbestos in place
When you contact us, share the property location, building use, proposed work, available reports, access constraints, and target schedule. We will discuss the assessment and consulting scope appropriate to your project.