Read our customer reviewsIdentify asbestos concerns before a renovation disturbs existing materials. EIS develops the survey scope around the work you plan to perform, including the affected rooms and relevant material layers. We explain what was evaluated, where access was limited, and how the findings affect the proposed work. Share the renovation scope early so the survey addresses the areas your contractor expects to disturb.
Discuss your projectA scope built around your project
Homeowners and contractors preparing to remodel, replace finishes, or open walls.
Independent assessment and guidance
EIS provides the agreed inspection and consulting services. A separate contractor performs asbestos abatement.
Findings you can use
Understand the assessed areas, documented limitations, and next planning decision.
Why does the renovation scope matter?
A useful renovation survey follows the work that will disturb materials. Removing a finish, grinding an adhesive, opening a wall, and replacing plumbing behind that wall may affect different materials. Give us a written description of the work, affected rooms, approximate removal boundaries, and the expected start date.
Survey requirements depend on the building and the project. Do not use age alone as proof that an assessment is unnecessary. We help identify the asbestos questions relevant to the proposed disturbance and explain what the agreed survey will address.

What if there are concealed layers?
Buildings change over time. A floor can contain several finishes, underlayments, and adhesives, while a wall can include later repairs. The inspector considers the materials and access available within the scope and identifies limitations that need attention before work reaches unassessed areas.
Consider a flooring project that starts as a surface replacement but later includes adhesive removal and an adjacent room. The original findings may not cover the new material or area. Pause that expanded disturbance and have the revised scope reviewed rather than assuming the first report covers everything.
Sampling locations and laboratory analyses are different counts
One location may contain several distinct materials, such as a floor covering, backing, and adhesive. Those layers may need separate analysis and reporting, so the number of collection locations can differ from the number of laboratory analyses. This can affect laboratory effort and the project estimate. Ask which materials, analyses, turnaround time, and possible additional work the proposal includes; do not assume one location always means one analysis or one fixed charge.
What happens before the contractor starts?
Review the survey and laboratory findings against the contractor’s planned work. Resolve identified access limitations, communicate material locations, and determine whether asbestos-related work or additional assessment is needed. Survey completion is one planning milestone; it does not automatically satisfy separate permit, notification, or contractor obligations.
If abatement is part of the project, establish design, monitoring, and completion responsibilities before scheduling dependent renovation work. EIS can support those consulting stages while a separate contractor performs abatement.
If the project needs a permit, confirm the municipality's documentation requirements before relying on a laboratory sheet. A report should connect the tested materials to the proposed disturbance. Sample Asbestos Report Guide.
Asbestos frequently asked questions
Explore related asbestos services
Plan testing before renovation
When you contact us, share the property location, building use, proposed work, available reports, access constraints, and target schedule. We will discuss the assessment and consulting scope appropriate to your project.